Main Works

Public and Road Works

  • Route 34, Metán-Estación Lumbreras, Palomitas-Río Juramento stretches and bridges in Lumbreras (Salta): basic works, asphalt paving and bridges.

  • Excavations and earthmovings in San Nicolás and General Savio Plant (Buenos Aires): earthmovings and excavations in 2.942.000 cubic meters.

  • Nacional Route 3. Caleta Olivia-San Julián stretch (Santa Cruz): basic works, asphalt paving and the construction of a bridge over the Río Seco. Approximately, 400 kilometers.

  • Paving on 1084 blocks in the City of Santa Fe (Santa Fe): urban paving, pluvial and sewer drains, and related works.

  • Pehuajó-Henderson road (Province of Buenos Aires): basic works and asphalt paving.

  • Provincial Route 65. Bolívar-9 de Julio stretch: basic works and asphalt paving, structural strengthen and widening.

  • Coronel Pringles Road, Provincial Route 76. Bypass Provincial Route 51: basic works, earthmovings, asphalt paving.

  • New Route 14, Ayuí Grande stream- Mandisov stream. Bridge construction: Basic works, asphalt paving, construction of a bridge over the Mandisoví Grande Stream.

  • Provincial Route 29 General Belgrano- Balcarce stretch, section VIII and access to Chas. Basic works, earthmovings, asphalt paving.

  • Provincial Route 60 Azul Rauch section II and III. Bridges over Cortaderas, de los Huesos and Chapaleufú stream. Basic works, asphalt paving and bridges.

  • Provincial Route 41, intersection with National Route 5 and railway, access to Mercedes (Buenos Aires). Basic works, asphalt paving and bridges.

  • Provincial Route 26 Va. Unión, Va. Castelli and construction of 8 bridges: basic works, earthmovings, asphalt paving.

Works for the Oil Industry

  • Palermo-Aike Road, Rio Gallegos (Santa Cruz): roads, working sites, tanks, fillings and embankments (YPF).

  • Comodoro Rivadavia Area (Chubut): earthmovings ditch and pipe line assembling.

  • Road maintenance in Cañadón Seco (Chubut): earthmovings and road maintenance.

  • Yacimiento Cerro Dragón Deposit (Chubut) earthmovings for the construction of working sites, roads and reservoirs for drilling rigs, road maintenance and various services (1991-1995).

  • Yacimiento Cerro Dragón: earthmovings for the construction of working sites, roads and reservoirs for drilling rings, road maintenance and various services (1995-2000).

  • Yacimiento Cerro Dragón: earthmovings for the construction of working sites, roads and reservoirs for drilling rings, road maintenance and various services (2001-2005).

Main Works in the Republic Of Chile

  • Bypass construction in Route 5-Route 57. Cerro Blanco sector-Casas de Chacabuco. Metropolitan Region: basic works, earthmovings, asphalt paving.

  • Route G-16 improvement. Quilicurá-Lampa sector. Metropolitan Region: basic works, earthmovings, asphalt paving.

  • Enlargement of Route 5. Camino Longitudinal Sur. San Carlos-Chillán sector(VIII region) 375 km: Basic works, earthmovings, asphalt paving.

  • Reconstruction of Route 69. Victoria-Curacautin sector-IX Region. Basic works, earthmovings, asphalt paving.

  • Reconstruction of Route 62. Quillota-Limache-Villa Alemana Sector. V Región. Basic works, earthmovings, asphalt paving.

  • Enlargement of Route 5 South. San Javier-Parral Sector. VII Region: basic works, earthmovings, asphalt paving.

replica watches